On March 26, 2008, the electrical engineer LinHong of Fives Stein (Shanghai) Industrial Furnace Co., Ltd. came to our company and check up the cubicle for the project of India. After repeat testing, the engineer Lin felt satisfied with that all of these cubicles had passed the test and got the leave factory test label. Mr. Lin hoped that we could keep on working hard and hold the excellent quality.